Cisco Blog » The Platform

2016年5月1日星期日

Cisco Notification Alert -Cisco Optical - CPT OTN 50 200 600-01-May-2016 16:53 GMT

 

 

 

 

 

 

 


Known Bugs - Carrier Packet Transport (CPT) System

Alert Type:
New
Bug Id:
CSCuz42132
Title:
VPLS traffic failure was observed on deletion and readdition of circuits
Status:
Open
Severity:
3 Moderate
Description:

Symptom:
Problem description:
VPLS traffic hit was observed for few VLANs in one direction on performing deletion and re-addition of End point EFPs, Real VPLS (With EFPs) and Dummy VPLS (Without EFPs) with PW class BFD timer 999 ms and 3.3ms

This traffic issue (traffic is not switched from switch fabric to core ports) was observed for VLAN 112

Reproducible: 3/4

Topology :

Node210 (4/3,7/1)--------(4/1,7/1)Node 32 (5/3,3/3)-------Node 77 (5/3,3/3)

Build : 9.705 FCS build

Conditions:
Steps to reproduce:
1. Load the attached DB (Node-32;Node-77;Node-210) in all three nodes

DB contains the following configurations,
10 (5+5) VPLS circuits with BFDoVCCV timer 3.3 ms between Nodes 210 & 32 and Nodes 32 & 77
10 (5+5) VPLS circuits with BFDoVCCV timer 999 ms between Nodes 210 & 32 and Nodes 32 & 77

2. Verify bidirectional traffic and traffic was flowing successfully
3. Create 8 (4+4) Dummy circuits with BFD timer 3.3 ms and 999 ms
4. Delete EFP points for all 20 VPLS circuits completely
5. Then add EFP points for 8 (4+4) Dummy circuits alone
6. Delete and re-create real VPLS circuits randomly
7. Delete and re-create Dummy VPLS circuits randomly
8. Verify bidirectional traffic and traffic failure issue in one direction was observed

Workaround:
Tunnel switchover by core port shut, lock out or PTF switchover

Further Problem Description:

Last Modified:
28-APR-2016
Known Affected Releases:
9.705
Known Fixed Releases:

Find additional information in Bug Search index.

 

2015 Cisco and/or its affiliates. All rights reserved. Terms & Conditions | Privacy Statement | Cookie Policy | Trademarks

 

没有评论:

发表评论